Another four (4) Fire Water Pump sets are on their way to the customer.

February 2024

After having the successful Factory Acceptance Test (FAT) witnessed by ABS (American Bureau of Shipping) and the end customer at our Test Facilities in Vianen, four (4) diesel/hydraulic Fire Water Pumps of each 2325 m³/hr have been shipped to the FPSO integration Yard in China.