Diesel Hydraulic Fire Water Pump Systems
Project description
SBM Offshore has announced that FPSO Liza Destiny has produced first oil as of December 20, 2019 and is formally on hire. The FPSO is installed at the Liza field, which is located circa 200 kilometers offshore Guyana in the Stabroek block. ExxonMobil affiliate Esso Exploration and Production Guyana Limited is operator and holds 45% interest in the Stabroek Block. Hess Guyana Exploration Ltd. holds 30% interest and CNOOC Petroleum Guyana Limited, a wholly-owned subsidiary of CNOOC Limited, holds 25% interest.
For this project Hydrodiesel successfully tested and delivered a total of three 1500 m³/h Fire Water Pump Systems. Each system consists of a hydraulic driven lift pump, installed below the water line, delivering water to a deck mounted diesel driven booster pump. The control philosophy is designed for full autonomous operation. Design, construction and testing according to the requirements of ABS and NFPA-20 is all done in-house.
Project:
FPSO Liza Destiny
Customer / End User:
SBM Offshore / ExxonMobil
Operator:
Esso Exploration & Production Guyana Ltd.
Location:
Guyana – Stabroek block, Liza field
Shipyard:
Keppel – Singapore
Classification Society:
ABS, NFPA 20
System capacity:
3x 1500 m³/h @ 125 mwc (3x 100%)