Another four (4) Fire Water Pump sets are being prepared for transport

August 2023

After having a successful Factory Acceptance Test (FAT) witnessed by Bureau Veritas at our Test Facilities in Vianen, another four (4) diesel/hydraulic Fire Water Pumps of each 2325 m³/hr are prepared for Seaworthy Packing and Transport to the FPSO integration Yard in China.